Image
Image

I-43 North-South Construction Update

Highland Bridge Deck Pour

About the Project:

The I-43 North-South Reconstruction project spans 14 miles from Silver Spring Drive north to WIS 60, in Milwaukee and Ozaukee counties. WisDOT is reconstructing I-43 to modern design standards and adding a lane in each direction. Additionally, five interchanges along the corridor will be reconstructed:

  • Good Hope Road
  • Brown Deer Road (constructing a new Diverging Diamond Interchange)
  • County Line Road (constructing a new full-access interchange
  • Mequon Road
  • Pioneer Road (County C)

This project also includes:

  • Construction of a brand-new interchange at Highland Road
  • Replacement of the Union Pacific Railroad bridge over I-43 in Glendale
  • Expansion of Port Washington Road in Glendale between Bender and Daphne roads

*All work is weather dependent and subject to change. Always check 511wi.gov prior to departure.

Stay Connected: Find us online at https://projects.511wi.gov/43north-south/

Pictures Attached:

  1. Highland Road Deck Pour
  2. Highland Road Bridge
  3. Port Washington Road Bridge
  4. Mainline construction at Donges Bay Road facing south
  5. Donges Bay Road Bridge